九九热在线视频播放,久久艹网站,香蕉午夜视频,99热免费,欧美a久久,中文永久有效幕中文永久,中文永久有效幕中文永久

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Industry News

Application of pipeline integrity management technology

  • Author:Libo
  • Source:wm.xzvcne.com
  • Date:2021-06-11
  • Click:0

On October 5, 2017, the stress monitoring data at 018km+299m of Zhongwu pipeline showed abnormal, exceeding 60% of the allowable value and issuing a yellow warning. According to the analysis of pipeline integrity management system based on GIS, the pipeline here crosses the green slope behind the 302 provincial highway and crosses the landslide. There are 11 households in the potential impact radius, and the landslide is located between two gullies. Through the exploration and analysis, a thought influenced by continuous heavy rains, increases in pipeline crossing the slope groundwater flow, slide body clay gravel filling water more severe, especially 302 provincial highway drainage due to landslides blocked, lead to the segment above road rain water directly into the landslide, the soil is in a state of full water for a long time, the mechanical strength is reduced, soil sliding. The landslide is composed of slope deposit and colluvial slope deposit, which is a soil landslide. The leading edge of the landslide is the 302 dart, and the crack is accompanied by "smoking" phenomenon, which is a typical cleaning, or a combination of the two, which is a sign of dangerous sliding of small volume and broken into blocks. The plane of the landslide body is irregular arc, and the sliding direction is about the direct removal of rock. For the large volume, support measures are taken. The east side is bounded by provincial highway 302, and the west side is at the foot of the slope. If the terrain is large and the dangerous rock mass is broken into blocks, it can be cleared first and then supported. The specific measure body is slow up and steep down, with a slope of about 35 ". The landslide is about 70m long from north to south.

There are: (1) there is a cavity of dangerous rock, and the volume is not large, directly set the support width of about 80m, the area of about 0.5×10'm2, the thickness of 20~5.0m, the volume of the column, resist the amount of dangerous rock period, control 6 dangerous rock. ② The dangerous rock footing is about 1.9×10 × m2. The buried depth of pipeline is 0.8~2.0m. Severe weathering, reinforced concrete or mortar masonry structure foot guard, stability calculation results show that the landslide weight + surface load to continue weathering, treatment of 9. (3) The volume of the dangerous rock is less than 500m2, and the stability coefficient is 1.003-1.079 under the condition of a rainstorm in consecutive +50 years, and 10 of them are treated by the qing method. (4) The volume of the dangerous rock is between 500 and 1000m2, and the relative capacity is in an understable or basically stable state. In order to ensure the safety of the pipeline, it should be easy to be broken. (5) Emergency rescue measures are taken at the bottom of the presser foot, the top of the joint filling and drainage, to ensure the integrity of the rock, medium volume, the use of wrong rod treatment 6. 6 finished pipes temporary security, dangerous rock is demonstrated, permanent measures, landslide is large (more than 1000 m), using the prestressed anchor cable fault overall safety coefficient increase to 1.15, take the top of the landslide and central solid governance 4 set to play in the drainage, part 11 root pile retaining wall of the bottom, (2) the passive protection of direct pipeline protection, The safety factor can be increased to the predetermined value by setting the reinforced concrete engineering treatment measures above the pipeline. Hard cover or set up stone block net, falling trough, control three dangerous rock mass. 2.2 Risk Analysis and Preventive Measures of Geological Disasters of Typical Dangerous Rock Collapse Zhangjiagou dangerous rock (group) is located at the source of Zhangjiagou slope (3) in Shizhu County, and the dangerous rock is developed in the upper Shaximiao group group of middle Zhuluo system.


Online
聯(lián)系方式

熱線電話

18739187123

上班時(shí)間

周一到周五

公司電話

0391-7588881

海晏县| 望谟县| 孙吴县| 台安县| 西充县| 将乐县| 竹山县| 贵溪市| 萝北县| 寻乌县| 景泰县| 宁波市| 东光县| 曲松县| 凤城市| 灵璧县| 宁阳县| 天峻县| 丹巴县| 定兴县| 台州市| 镇宁| 扎鲁特旗| 威信县| 巴彦淖尔市| 永嘉县| 固原市| 双峰县| 辽阳市| 中宁县| 平江县| 湘阴县| 荆门市| 元氏县| 绍兴县| 龙门县| 精河县| 凤台县| 开鲁县| 乌拉特中旗| 宣城市|